Gasworks – A Modern Development with a Heritage Heart

Gasworks building developmentOngoing development of a historical site located at Newstead (Brisbane), sees it transforming in stages to a new mixed use precinct. The name derives from the sites original use – the gasworks, and part of the project is to protect the heritage listed gasometer located prominently amid the gasworks buildings.

Originally built in 1863, the gasometer once stored gas in a large bladder contained within its frame work.  The Gasometer has been fully restored ensuring the ornate pinnacles and lace work beams stand as equal alongside its newly constructed neighbours.  It creates a unique contrast set amidst the strong lines and bold shapes of the modern architectural features of the Gasworks building development.

Designed by the same team that worked on the adjacent Energex building – Architect Cox Rayner and builders FKP, the buildings in this phase of construction comprise of Building A on Skyring Terrace (five storeys) and Building E on Longland St (three storeys).

G.James Role

G.James Glass and Aluminium supplied and installed glazing facades, doors, windows and some extruded sun hoods. Building A has a proposed 5 star green star rating – so energy efficiency, acoustics and air infiltration were important design factors. As such, products with proven test results were selected for use.

Building A

Building A comprises ground floor shop front retail with four upper levels of offices. The offices utilise the flush glazed 651 series glazed with IGUs made up of green glass with a low E coating for energy efficiency, a 12mm air space, and 6mm clear glass internally. This also assisted in achieving a better acoustic rating.  Spandrel panels were made with a green ceramic painted surface – a premium spandrel glass option  that maintains the look set by the vision area.

Building E

Building E was a combination of two levels of residential apartments along Longland Street, two levels of office space along the breeze way between the buildings, and a retail shop front precinct on the ground level. The offices in building E utilize the 650 series, also flush glazed, but to accommodate 11.52mm laminated glass. The glass has a low E coating and the same colour, but didn’t require the same level of acoustic rating or energy efficiency. The office glazing also incorporated architectural features such as glass fins for extra strength and sun hoods for protection.

The residential apartments use a range of glazing styles. Fixed framing used the 650 series system with 265  series awning windows spaced across the facade. Balconies feature four side supported 550 series balustrades with access through 445 series sliding doors.

Shopfront Design Problem

The retail areas required a centrally glazed pocket, but the opening size and wind loads exceeded the constraints of the current system.  As many architects are looking for options to make windows larger, the decision was made to replace the current aluminium vertical members, the mullions, with a stiffer option. The new design also incorporated the ability to strengthen it further. This new addition to the G.James range is used extensively throughout the Gasworks project.

Practically Completed

Practical completion was achieved on the 3rd August, 2013, however there are still minor works, interior fit outs and landscape work under way.  Building E has been designed so a residential tower can be constructed above it in the future.

The Gasworks project is an aesthetic feast, and well worth a look if you are in the area. Please consult the interactive map project to get the location and a summary of the project information.

Capitol Apartments

The Capitol ApartmentsCapitol Apartments has been recently constructed at 35 Peel St, South Bank, Brisbane, QLD. It is a 10 storey building designed by Kowalski and built by TMF. This project is situated in the busy west side of South Bank, along some major traffic routes – one being Queensland Rail train tracks and rail bridge.  It is an ambitious project considering its location, and had very stringent guidelines to achieve before it was allowed to be constructed.

Strict Design Criteria

The main aspect of design took into account the proximity to the adjacent train line. Acoustics is an obvious problem, but the location of the railway tracks are within a stones throw, literally. As such, protection of the railway tracks from litter being thrown onto the lines is of critical importance. Accompanying this, the architects designed a building with many differing glazing requirements to achieve a cohesive up market residential property. This building is to be used as furnished apartments for long or short term accommodation for people in the South Bank area. With venues like Rydges and other large hotel names in the vicinity, a boutique, stylish result needed to be achieved. The Capitol Apartments The initial design phase required the windows to comply with acoustic standards, or the apartment would not get approval to be built. G.James were the only glaziers that could beat all the ratings required, and provide evidence via testing that these results were guaranteed. The design initially specified opening sizes to be built to, but to ensure quality, it was actually done as a measure and fit job. As such, the lead times were brought down dramatically in the manufacture and installation scheduling required to meet the builders time line, which G.James achieved.

Design Resolution

To accommodate the requirements to protect the tracks from litter, all windows to the railways (northern) elevation were fitted with fixed Crimsafe screens. The balconies are set up as an Alfresco area, and the Lismore designed version of the 445 sliding door system was used for the operable windows overlooking the tracks and the city, with a fixed light beneath. The Lismore design, allows the sliding door to be operated from the inside, allowing the Crimsafe screen to be fitted and fixed externally. This alfresco area also helps protect the interior from noise pollution. The Capitol Apartments Bedrooms were fitted with jockey sashes to provide an adequate acoustic barrier, and living spaces had IGUs (as well as the alfresco area) to protect it from railway traffic noise. Both use the 451 system. Some balconies also have 136 Double Hung IGUs incorporated into their design. Other areas use differing glazing suites including the 165 slider vents to wet areas, 265 awning windows, 651 shop front with IGUs in the gym on level 1 with a 476 hinged door.  The main entry was a 475 auto sliding door, and the 477-300 bi-fold system with a lowlight under in  650 framing are a suitable finish in the restaurant. All framing not done on the railway elevation used various types of SGUs to suit the look required. The Capitol Apartments We have released a project map to provide the location and a summary of works.  Keep an eye out for the Capitol Apartments on this map…

Interactive Map: Building Brisbane

Brisbane construction projects by G.James Glass & Aluminium

Brisbane, being the location of our Head Office, sees many fine examples of G.James workmanship.   Here, we outline some of the biggest and best projects undertaken to showcase our capabilities in recent times.

The interactive map is designed so you can take a tour of some of our most recent and notable works.  Either at your desk looking out a CBD window, taking a stroll around town, and driving past a building or through an area you have always wanted to know more about.

Brisbane

G.James has contributed widely to what Brisbane looks like today.   There are buildings that have added to Brisbane’s sky line and to the diversity of looks and uses that are designed for the various parts of this fair city.  On some buildings, there are unique features that make them distinctive.  For example –

  • the ribbons of M&A,
  • the splash of red across the Australian Federal Police building,
  • the glass wall of Sir Samuel Griffith Centre,
  • the towering Aurora and Riparian plaza.

There are many buildings that have achieved the coveted green star energy efficient design,  some interesting artwork on glass designed by local artists – its worth a visit to the Anthropology Museum at UQ to see the ceramic printed window alone. Some of the buildings have specialised glass systems to suit the works being done, like the Translational Research Institute and the ABC headquarters.

There are projects that have altered the face of a tired old façade, so if you look at an old image of QIMR, you won’t recognize it.  And then theres the Suncorp Stadium which gives you a glimpse inside a place where state pride and competition is on the line.

The Interactive Map

The map is aimed to give you a glimpse into the depth the G.James knowledge base and provide an overview of the types of works that G.James is capable of.  It highlights projects done by various departments in the company, including:

  • Commercial departments
  • Residential departments
  • Gossi park and street furniture
  • Glass department

You can have a look at the map and plan out a scenic drive, or target specific jobs, or just get an idea of what we have produced, in your area.  As you can imagine, there are too many jobs to make this an all-inclusive list, but we aimed to include a range of jobs reflecting different styles and features.

A brief dossier on the project is included – a photo of what to look for, basic job data and links to further information on the project.  G.James can help you with any further information required for the jobs represented.

Explore Here…

Enjoy the exploration, and keep an eye on this space. Other areas will be released as our database of projects rolls out – Sydney, Melbourne, the Gold Coast, as well as other areas to be where you can find G.James fingerprints…

Until then, enjoy this insight into the River City.

Key:

 G.James Projects

 Gossi Designs

51 Alfred St – Efficiency in commercial design

51 Alfred St A green star accredited office block constructed in one of Brisbane’s growing commercial areas, 51 Alfred St comprises of a ground floor retail space with 8 levels of office space above.

51 Alfred St, Fortitude valley was constructed by Blackwatch Projects, to the design of Willis Greenhalgh Architects. The sustainable design intended to minimise its carbon footprint was a urban friendly solution to council and the community. It includes a smart foyer, featuring floor to ceiling full height glazing on two street frontages, and superb views to the city above level 2.

G.James Role

Development of the project went from initial “design in principle” early drawings to installation of the finalised glazing products. The project had a short time frame, and lead times for manufacture and installation had to be carefully managed.

The building incorporates shopfront glazing from ground floor to level 1 that used the 850-500 and 650-500 series framing systems. Hinged doors are 475 or 476 series, with 445 series sliding doors (as on some upper levels, also). G.James picked up the cladding package for the ground floor columns, which was made and fitted by the G.James Joinery department. QuickAlly, G.James scaffolding division assisted with providing access to entry the shop front entry glazing.

Upper levels utilizes the 651-500 curtain wall suite. The design had to allow for the addition of randomly placed aluminium horizontal and vertical fins that use different shapes in keeping with the difference in direction. There are also composite cladding positioned irregularly across the southern face, and frames the edge of the eastern face.

All of the differences in cladding and sun shading incorporated into the curtain wall, made for a wide variety of specialist panels.  This required coordinating the transportation and installation of the panels to be highly organised. Careful design, preparation and on site works were given particular attention at the corner feature to achieve the seamless angled cladding and glazed finish that spans the full height of the buildings office area.

Glazing selection

IGU’s were used in the vision areas of the tower to combat city noise and provide sufficient thermal and solar efficiency to achieve the green star accreditation.

The spandrel area uses a colourlite backing on clear glass to achieve the opaque finish. Charcoal and White were used to keep in theme with the buildings monochromatic scheme that highlights the slash of copper that makes the corner feature stand out.

Installation

There was no tower crane available for this job, so all of the framing hoisted into the floors from a crane on the street below.  Including the “Spider Hulk”, the name of the lifting crane that positions the panels into place.

51 Alfred St

“Spider Hulk” is the name of the machine that lifts the panels into position on the building.

Early design intended the framing to be fixed into cast ins – a quick and minimal fixing method that utilizes the concrete structure to enclose and support the framing. Later changes, however, meant that the frame fixings were redesigned and engineered to be fitted with bolts into the concrete.

The ground floor was site glazed as the size of the glazing was so large. There was also a curtain wall panel that needed to be site glazed. This requires extra safety measures and some specialised techniques to carry out.

Blackwatch had a tight program which was run like clockwork. It enabled overall job satisfaction with the resulting installation of the work performed by G.James, and we look forward to working on further projects together.

Project Update: Queensland Institute of Medical Research

QIMR Herston Rd Entrance

Transforming an existing medical research facility in Herston, QLD to align with the surrounding complex.

Queensland Institute of Medical Research Phase 3, or QIMR ph. 3, is the refurbishment of the Bancroft Centre. It is located just outside Brisbane’s CBD next to the Royal Brisbane Women’s Hospital.

The Bancroft Centre, owned by QIMR  is contracted to be built by Watpac. The project is designed by a joint architectural venture between Wilson and Wardle architects.

G.James’ Role

This project initiated as a design and documentation contract, in which G.James were required to advise and recommend the design of glazing works, survey the existing building and detail the information via formal drawings. Due to the positive contributions and coordination of this aspect of the project, G.James were awarded stage 2 – the supply and install of the glazing works.

The Bancroft Centre

The Bancroft Centre is a 14 storey concrete building with feature beams and columns criss crossing the building dividing up the individual windows and balconies spread across the elevations. At ground level, a large lobby window and sub station louvre is also part of the upgrade.

The medical research undertaken at the centre is highly sensitive. In the pursuit of the solutions being investigated, the building will be partially occupied by the client throughout the construction process. This will affect parts or entire floors at different stages. Close coordination of on site works, monitoring clients requirements and ensuring safety for all, dictates progress.

External Refurbish

The basic concrete structure remains, with the southern concrete face being removed and extended out towards Herston Road. The extensions are supported by a grid work of steel with concrete platforms. The face lift is to extend down the western side to the existing balconies and on the eastern side to the recently erected QIMR central building.

The architectural intent is to create a look that reflects the existing Clive Berghofer Cancer Research Centre (CBCRC) located on the other side of the QIMR central building. To do this:

  • The main façade on the curtain wall is being replicated as much as possible.
  • The visible rendered sheer walls are being covered with Alpolic cladding to wrap around to the front of the balconies and underside of the soffits in a similar fashion to the CBCRC building.
  • Glazing in the balconies and lobby were replaced to reflect the more natural colour scheme and full height layout of the CBCRC.
  • Louvres are being modernised and/or introduced to cope with the needs of the buildings updated research capacity, the design of which is in keeping with the other QIMR buildings.

G.James has followed stringent processing and approval of the glazing samples and design to ensure these principles are followed adequately.

Design: Energy and Acoustic Efficiency

Renovations on old buildings require them to be upgraded to meet the latest energy efficient guidelines. To accomplish this, the Bancroft refurbishment required higher performing windows than the original.  Another important design element to consider was that the Bancroft Centre is situated at what is now one of Brisbane’s busiest intersections.

Fronting onto Herston Road, a stones throw from Bowen Bridge Road, bus ways and the Inner City Bypass, shows the heightened necessity for acoustic protection.

The main curtain wall façade utilises the 651 series with highly efficient IGU’s made from Solarplus engineered glass with an acoustic laminate internally to assist with noise deadening. The visible features of the curtain wall replicate that of its neighbour providing a plaid pattern of greens and silver that provide the desired sister building effect.

The balconies use 450 framing with 475 door systems for the balconies’ hinged and sliding doors. A custom solution was introduced with laminated glass incorporating a thick 1.14mm acoustic laminate and energy tech inner lite working together for maximum efficiency and sound protection.

An environmental advantage to being involved in the design of the cladding, minimised the wastage by designing the cladding widths to suit what was commercially available. Approximately 85% of the panels could be made to their natural width.

Unusual Design Elements

The lobby or main entry spans a height of two stories. It has concrete features penetrating through the facade. This required some innovative design to incorporate these obstacles while maintaining the ability to replace the existing framing in a short turn around of a week. 650 framing was used in the lobby to achieve this.

The curtain wall is usually lifted into place by a mini crane positioned on the building.  It is dedicated to the curtain wall install.  On QIMR however, a tower crane had been fitted on site to accommodate phase 2 construction, and is also being used for phase 3.  This meant that fixing the curtain wall had to be timed in between other site deliveries and other uses required of the crane.

This has been a unique project with G.James contributing very early in the design process to assist in setting our the buildings requirements for our own and adjacent works. The achievements so far have culminated with smooth progression though out the project with the mutual assistance and close coordination between Watpac and G.James.

Looking ahead

G.James role at the Bancroft Centre is to be finalised approximately mid 2013, and the entire project to be competed by mid 2014. Tours of the QIMR facilities are available to the public. You can book a tour on the QIMR website.

Project Update: KSD – Hamilton Harbour

Hamilton Harbour - KSD building

We first mentioned Hamilton Harbour – a joint venture between developers Devine Limited and Leighton Properties, designed by Cox Rayner Architects on our blog several months ago. Back then, we were putting finishing touches on the third residential building of the mixed use development. Now, a little bit further down the line, we have nearly completed the façade on KSD – a 5 floor commercial building on the site.

ConstructionPartially installed Façade

The KSD building makes use of a range of G.James façade products. Our 546 series curtain wall system with IG units was used to create the façade. LE40 coated ‘Evergreen’ glass was selected to meet required performance criteria. Our 775 series sunshades and sunblades have also been used to improve the performance of the façade, whilst enhancing the aesthetic value of the building.

From project acceptance to install was a very quick turn around, our nearby Fison Avenue factory was a integral part of achieving the programmed dates. Installation on site also happened over a short timeframe – commencing on the 10th of October, with the main curtain wall completed by 15th November.

Looking Forward

G.James have enjoyed a close working relationship with Devine Constructions, which has ensured tight project deadlines are met on-time. We hope to continue our collaberation in the future.

Cairns Botanic Gardens Visitor Centre

Visitor Centre, Cairns Botanic Gardens

The new visitor centre at Cairns Botanical Gardens is quite literally a reflection of the tropical beauty of far north Queensland.

A ten minute drive from the centre of Cairns, the Botanic Gardens are a great place to unwind, and the new visitor information centre is the place to start.

Visitor Information Centre

The new visitor information centre is a $4.6 million dollar project to revamp the facility and provide an iconic new gateway into the gardens.

Designed by Charles Wright Architects and constructed by Hansen Yuncken, the building is a mixed use building, divided into two “wings” separated by a breezeway. One wing houses visitor facilities such as a cafe, gift store and auditorium, while the other functions as office space for council staff and includes a meeting room and administrative facilities.

On Friday 16th November 2012 the National MBA Awards were held in Canberra. The Cairns Botanic Garden Visitor Centre was awarded the National Commercial Construction ($5 million to $10 million) National MBA 2012 Award.

Green Building

Visitor Centre, Cairns Botanic Gardens Printed WallOne of the primary goals of the building was to be “green”, in order to complement the gardens. To achieve this a number of technologies and techniques were incorporated into the design.

A big focus was placed on environmentally sustainable design (or ESD). This includes a number of green features such as thermal/solar chimneys which allow convection ventilation and also provide natural light inside the building.

The building also features water collection for reuse in both the building and gardens, and a thermal mass system to passively cool the environment and reduce dependence on active cooling systems such as air conditioners.

In addition, the visitors wing includes glass stacking doors which fold up completely to allow maximum airflow and open the facility directly onto the gardens.

Mirrored Windows & Printed Glass

Visitor Centre, Cairns Botanic Gardens ShopThe most notable aspect of the project is the use of mirrors to reflect images of the lush gardens and blend the facility into its surroundings. This was achieved with a reflective film applied to the glass.

The lower level windows have artwork printed on the glass using a digital ceramic printing process. This complements the mirrored glass and brings an aesthetic quality both indoors and out.

Cairns Botanic Gardens

The Cairns Botanic Gardens area includes the Flecker Gardens, Centenary Lakes, Mt. Whitfield Conservation Park and the Tanks Art Centre. The newly constructed visitor centre offers a great way to explore the area and facilitate community activities, through the auditorium and locally sourced gift shop.

The new visitor centre was completed in late 2011 and is open to the public 7 days a week, excluding public holidays.