Bushfire Risk, Assessment and Glazing Solutions

Australia has a love hate relationship with bushfires. It has been so much a part of the natural history here it has become an endemic part of existence; without bushfire certain plants wont propagate, although the rest of anything living, fears it. It’s just one of the many parts of the Australian lifestyle that needs to be taken in a serious light – and be prepared for.

Assessing Bushfire Risk

There have been major developments in ways to protect in the case of bushfire – from household escape plans, to continuing technology in fire fighting strategies and more recently since dramatic fire events, building design. Australian Standards have developed AS 3959, and as part of that, a system that determines your Bushfire Attack Level or BAL. In the BAL, it gives a provision for products in the building industry to be rated according to their resistance to bushfire attack.

The BAL rating for your situation can be determined by referring to AS3959 or guides provided by your local services. NSW Rural Fire Service has a comprehensive user guide as an Application Kit to the BAL for reference. You will attain one of six rated categories. Your risk is assessed by looking at type and proximity of vegetation, and the slope of the land your property is on. Your calculated BAL rating is used to select building products. Products will be rated with the same figures, offering protection for that level of BAL rating.

BAL Rated Glazing Options

G.James Glass & Aluminium has developed a BAL manual to guide people through making the right decision when looking at glazing products. It outlines the G.James glazing suites that should be used for buildings in the following high risk categories:

  • BAL 19
  • BAL 29
  • BAL 40

The G.James BAL manual outline the glazing system, glass type, hardware, gaskets and mesh requirements for the individual systems according to your BAL rating. As an example, if you have a rating of BAL 29, and need a double hung window, we will suggest you use the following:

The 136 Series Double Hung Window with a minimum of 5mm toughened glass, standard mohair, glazing vinyls and other hardware, and external screens require a fire retardant spline with aluminium or steel mesh with an aperture of less than 2mm. This is an example only, and you need to confirm details with G.James staff that can ensure these are the products you need for your individual situation.

Your selection of glazing should not be limited. G.James have BAL glazing solutions for sliding doors, louvres, double hung windows, fixed windows, hinged doors, bifold doors, awning windows, casement windows and sliding windows. When you talk to G.James personnel, they can guide you through the options.

Requirement for Buildings

There is no requirement to alter existing building materials, but if you plan on building or renovating, you will need to implement the recommendations of the the BAL report. It is a wise idea to be aware of the rating your property would get even if you aren’t looking at building in the near future. Finding out the weak points, you can make minor adaptions to the building materials or surrounding vegetation to give yourself a better chance in case fire ever threatens your neighbourhood.

Be aware of the different ways you can keep knowledgeable about risks in your area. Know your local brigade and SES, having their contact details on hand. Check your states fire services for more information.

During recent fire incidents when the heat was on, communication became difficult due to cut lines, and websites being bombarded and going down. The NSW Rural Fire Service had a great system of reporting regular updates on their face book feed. Know where to keep up to date on the latest details and leave emergency lines free for those that require it.

Be prepared and stay safe.

Glazing 918 Darwin Apartments in a Single LEAP

G.James Glass and Aluminium - Transport DivisionStage 2 of the Australian Defence Force’s accommodation upgrade to their Single Living Environment and Accommodation Precinct (LEAP) in Darwin saw the construction of 918 new apartments. It was a highly organised development that had strict protocols and required innovative task management to accomplish the project.

This upgrade will improve and better integrate the living standards and communities where single defence personnel reside. The project is being managed by the Plenary Group, recognised as international specialists in providing whole community concepts, with Woods Bagot as the architect.

G.James Role

G.James Glass and Aluminium’s Darwin office successfully negotiated the contract to supply and fit glazed windows, door frames, security doors and louvres to the various planned concepts in two locations – Larrakeyah (in the city) and Robertson (rural). Each site had individual acoustic, thermal (energy efficiency), wind loading, water penetration and bushfire requirements which formed part of the specification. To ensure compliance, G.James undertook  product modifications, the development of new systems and conducted testing for the intended suites. The contract is to be achieved in two phases of supply and installation that span over 1 ½ years.

G.James is organised to take on projects of this scope. Divisions including business support services and transport are combined with a large workforce and the latest technology to fulfil the resource requirements of larger ventures. For the Darwin project, initial discussions internally located potential branches with facilities and personnel available. Once the project was awarded, managers designated the resources available to meet the commitments.

Design

Darwin comes with stringent water and wind pressure requirements.  Product testing was needed for the new 472 Series door framing system and the 246 Series sliding door for Darwin’s conditions.

Energy efficiency was addressed using IGU’s.  This also helped resolve the acoustics issue at the Robertson location, as there was a flight path located overhead.

BAL Rating

Bushfire ratings are addressed at the Robertson location due to the proximity to bushland in its rural setting.  A Bushfire Attack Level (BAL) rating is given to an area or facade to determine the requirements of the materials used.  Glass and gaskets are selected that comply with these conditions from the G.James BAL Manual.

The BAL ratings applied to G.James materials have been determined from AS3959 as “Deemed to satisfy” or the prescriptive method.  The prerequisite for the physical properties of glazing materials in bushfire prone areas is to resist ember attack and radiant heat transfer.  Your local branch or G.James representative can give you further information on BAL compliant products available.

Implementation

The work was divided up in accordance with the capabilities and current workloads of various branches. Some were accustomed to this volume of work, and others were introduced to it.  The branches involved are outlined as follows, with a brief summary of the who they are, and a quote about what this project entailed for them:

Head Office

Initially, the Business Support Service division at G.James’ Head Office assisted the Darwin branch with project specific engineering, product design, contract administration and material / production coordination.

“This included a review of the products to create efficiencies in product manufacture and installation. Because of the distance that products were to travel by road, we also orchestrated the design of several specific packing crates.” – John Staunton (Manager of Business Support Service).

G.James’ Head Office is charged with the role of being the central point of direction for the branches with regards to technical advice, administrative services and major project logistics & coordination. This responsibility is assisted in the fact that the Head Office is in close proximity to the Group’s major manufacturing facilities at Eagle Farm.

Maroochydore Branch

Maroochydore supplied the entry door frame, highlights and sidelights made with the new 472 Series, as well as Crimsafe screens.

“For 12 months, the Darwin Defence Accomodation has been keeping our commercial and Crimsafe departments with a constant flow of work. The Emmegi CNC machine has been vital part of the processing for the doors required on this project” – Darren Mahoney (Branch Manager)

Bundaberg Branch

Bundaberg worked on 475 Series fixed louvre grill and top hung sliders, Crimsafe screens for the 246 Series sliding doors, and 475 Series hinged Doors.

“It has been amazing to see the various number of branches working together to have all items made, packaged and then transported to Darwin (without damage) ready for installation all within the tight time frames. “ – Damian Perry (Estimator)

KDC

KDC (or the Knock Down Components factory in Brisbane) cut and processed assembly kits for the 246 Series sliding doors.

“We have only had to replace two door frames due to transit damage which demonstrates our attention to detail and ability to supply component parts to the correct specification on time to allow for efficient project management ongoing.” Jason Claridge (Branch Manager)

KDC typically make standard glazing packages for nationwide distribution.

Riverview

Riverview provided framing for the 472 Series fixed glazing and hinged doors.

“Riverview are accustomed to national distribution, being the only manufacturers of double hung windows, so coordinating this project was not out of character.  It did allow us to contribute our other skills and it was fantastic to be a part of such a combined effort.” – Ben Driessen (Branch Manager)

Along with Double Hung Windows, Riverview have a stock of unusual glass types and patterns that are invaluable to replacing period style glass.

Woodridge

Woodridge took care of the 048 Series fixed and awning windows.

“The scale of work for this job saw our manufacturing processes streamlined. It is good to know just how much work we are capable of doing.” – Garry Fulton (Branch Manager)

Woodridge produces almost all products made by G.James products (except double hung), and services the area from south of the Brisbane river to the top of the Gold Coast and out to Manly and Redland bay. They also make a lot of commercial products for Western Australia, and supply 048 series hopper windows to other branches and departments.

Glass Department

The Glass Department in Brisbane manufactured all the glass for the project.

“Our glass department is built to take mass orders of this size, so implementing it was not a problem.  It is good to work on this scale of project, knowing we are contributing to such a large G.James effort.  It is what makes G.James the company we are – we have the ability to take on this kind of work as we have the most sophisticated and modern technology available to us.” – Tony Evans (Operations Manager)

The sizeable glass operations produce many different types of glass – from sizing annealed, coated and tinted, to manufacture of laminated, toughened, printed, patterned as well as IGU’s.

Mechanical and Transport Division

Mechanical and transport departments provided transport for all the components to be brought to Brisbane for coordination and shipping to site.

“We coordinate this type of work all the time – the volume of this job was quite large, however, and meant strict management of delivery – the right products at the right time.” – John Erskine (Transport Manager)

Transport run a fleet of trucks up and down the East Coast of Australia (Sydney to Cairns) to service delivery of the full range of G.James products.

Darwin

Darwin – project coordination and implementation.

” We would never have been able to pull it off without the support of all the other branches that got involved and helped us make this job a reality. To everyone – thanks, it was greatly appreciated.” – Scott Harris (Branch Manager)

On Site

The products, when ready, were transported to Darwin, and fixers were sub contracted to carry out the vast workload at installation.   Attention to detail was essential as all the glass for this project was site fitted because of additional fixings in the glazing pocket required to meet the high local wind loads.

Project status

The project is in its final stages, and is projected to be complete by the end of this year (2013).  Coordinating our resources to achieve higher rates of product supply is not a new service performed by G.James.  We are capable of performing this kind of logisitical coordination to make this scale of projects feasible. G.James welcomes discussion to assess how we can provide solutions for any similar large projects.