QIMR Curtain Wall Install Published January 21, 2013 at 1440 × 1920 in QIMR Curtain Wall Install ← Previous Next → Lifting a façade panel into place. Individual Panels are lifted into position with the site crane. Specialised blocks are engineered to spread the load evenly, and protect the panel during the lift. -27.449667153.026833